Managing Building Construction and Equipment Installation In AITC Malaysia : A Lesson Learned(ICSANE 2014(International Conference on Space, Aeronautical and Navigational Electronics))
,
PDFダウンロードページ PDFダウンロードページへ
抄録(和)
抄録(英) In any typical situation, the setting up of a new Space Technology Test Centre is normally done by a single contractor, which include designing the building, managing the contractor, procurement and installation of the test equipment. However, for Malaysia, the construction work and equipment installation are done by separate contractors. Managing both construction works and equipment installation was no easy feat as there were several issues faced by ANGKASA once the construction began. This paper will present the five stages of integration between building works and equipment installation and explore the issues found at every stage, and how steps were taken to addres those issues. Review and monitoring is done continuously to ensure that the final result will be a complted and workable AIT facility that meets all the specifications and requirements specified.
キーワード(和)
キーワード(英) Integration Work / Construction / AIT
資料番号 SANE2014-70
発行日

研究会情報
研究会 SANE
開催期間 2014/10/15(から1日開催)
開催地(和)
開催地(英)
テーマ(和)
テーマ(英)
委員長氏名(和)
委員長氏名(英)
副委員長氏名(和)
副委員長氏名(英)
幹事氏名(和)
幹事氏名(英)
幹事補佐氏名(和)
幹事補佐氏名(英)

講演論文情報詳細
申込み研究会 Space, Aeronautical and Navigational Electronics (SANE)
本文の言語 ENG
タイトル(和)
サブタイトル(和)
タイトル(英) Managing Building Construction and Equipment Installation In AITC Malaysia : A Lesson Learned(ICSANE 2014(International Conference on Space, Aeronautical and Navigational Electronics))
サブタイトル(和)
キーワード(1)(和/英) / Integration Work
第 1 著者 氏名(和/英) / Lai Leng Elena WOO
第 1 著者 所属(和/英)
Space Development and Operation Division, ANGKASA Malaysia Space Centre
発表年月日 2014-10-22
資料番号 SANE2014-70
巻番号(vol) vol.114
号番号(no) 264
ページ範囲 pp.-
ページ数 4
発行日