Presentation 2007-04-25
Fast Simulation of Power Grid using Two-Layer CNN
Yuichi TANJI,
PDF Download Page PDF download Page Link
Abstract(in Japanese) (See Japanese page)
Abstract(in English) A fast timing analysis of plane circuits via two-layer CNN-based modeling, which is necessary for the solution of power/signal integrity problems in printed circuit boards and packages, is presented. Using the new notation expressed by the two-layer CNN, more than 1500 times faster simulation is achieved, compared with Berkeley SPICE (ngspice). In CNN community, CNNs are generally simulated by explicit numerical integration algorithms such as the forward Euler and Runge-Kutta methods. However, since the system of the two-layer CNN becomes stiff, we cannot analyze the CNN by using an explicit numerical integration algorithm. Hence, to analyze the two-layer CNN and reduce the computational cost, the leapfrog method is introduced in this paper. This procedure would open a CNN application up to electronic design automation area.
Keyword(in Japanese) (See Japanese page)
Keyword(in English) CNN / Power Grid / Fast Simulation / Leapfrog
Paper # NLP2007-9
Date of Issue

Conference Information
Committee NLP
Conference Date 2007/4/18(1days)
Place (in Japanese) (See Japanese page)
Place (in English)
Topics (in Japanese) (See Japanese page)
Topics (in English)
Chair
Vice Chair
Secretary
Assistant

Paper Information
Registration To Nonlinear Problems (NLP)
Language ENG
Title (in Japanese) (See Japanese page)
Sub Title (in Japanese) (See Japanese page)
Title (in English) Fast Simulation of Power Grid using Two-Layer CNN
Sub Title (in English)
Keyword(1) CNN
Keyword(2) Power Grid
Keyword(3) Fast Simulation
Keyword(4) Leapfrog
1st Author's Name Yuichi TANJI
1st Author's Affiliation Reliability-based Information Systems Engineering, Kagawa University()
Date 2007-04-25
Paper # NLP2007-9
Volume (vol) vol.107
Number (no) 21
Page pp.pp.-
#Pages 5
Date of Issue