Presentation | 2006-05-30 The Integrated Methodology for both Supply-chain management and Information system development, using business process reference model (Detail planning phase) : Middle-level business process design including internal controls Kazuyoshi Watanabe, |
---|---|
PDF Download Page | PDF download Page Link |
Abstract(in Japanese) | (See Japanese page) |
Abstract(in English) | After integrated designing the upper-level business process for material flow and information flow reflecting a supply-chain strategy, in a detailed plan phase, we have to begin the design of the middle-level process. Realization measure of a strategy and tactics, standardization of a process, risk control for internal control to financial reporting and regulation system, and requirement from the user who deals with a process, these many various demands are designed on level 4 process, and it hands over to the design of the following lower-level process. |
Keyword(in Japanese) | (See Japanese page) |
Keyword(in English) | Standardization / Simplification / Internal control / COSO framework / Risk control / Requirement analysis |
Paper # | SWIM2006-2 |
Date of Issue |
Conference Information | |
Committee | SWIM |
---|---|
Conference Date | 2006/5/23(1days) |
Place (in Japanese) | (See Japanese page) |
Place (in English) | |
Topics (in Japanese) | (See Japanese page) |
Topics (in English) | |
Chair | |
Vice Chair | |
Secretary | |
Assistant |
Paper Information | |
Registration To | Software Interprise Modeling (SWIM) |
---|---|
Language | JPN |
Title (in Japanese) | (See Japanese page) |
Sub Title (in Japanese) | (See Japanese page) |
Title (in English) | The Integrated Methodology for both Supply-chain management and Information system development, using business process reference model (Detail planning phase) : Middle-level business process design including internal controls |
Sub Title (in English) | |
Keyword(1) | Standardization |
Keyword(2) | Simplification |
Keyword(3) | Internal control |
Keyword(4) | COSO framework |
Keyword(5) | Risk control |
Keyword(6) | Requirement analysis |
1st Author's Name | Kazuyoshi Watanabe |
1st Author's Affiliation | Management & ERP Integration Co., Ltd() |
Date | 2006-05-30 |
Paper # | SWIM2006-2 |
Volume (vol) | vol.106 |
Number (no) | 85 |
Page | pp.pp.- |
#Pages | 6 |
Date of Issue |