Presentation 1998/11/19
The result of international verification testing(Step1) for ISS power system
Yasuhiro Shimizu,
PDF Download Page PDF download Page Link
Abstract(in Japanese) (See Japanese page)
Abstract(in English) The international verification testing(Step 1) was done verify the power system interface between ISS(International Space Station) and JEM(Japanese Experiment Module). The test configurations simulated Flight 1JA and Flight 1J. In this test, the power quality and the function of system protection to isolate abnormal loads(ex. short load) were evaluated. The result of test was good, and it was verified that basically ISS/JEM interface met the power specification.
Keyword(in Japanese) (See Japanese page)
Keyword(in English) Space station / JEM / Power system
Paper # A・98-120,SANE98-87,SAT98-65
Date of Issue

Conference Information
Committee SAT
Conference Date 1998/11/19(1days)
Place (in Japanese) (See Japanese page)
Place (in English)
Topics (in Japanese) (See Japanese page)
Topics (in English)
Chair
Vice Chair
Secretary
Assistant

Paper Information
Registration To Satellite Telecommunications (SAT)
Language JPN
Title (in Japanese) (See Japanese page)
Sub Title (in Japanese) (See Japanese page)
Title (in English) The result of international verification testing(Step1) for ISS power system
Sub Title (in English)
Keyword(1) Space station
Keyword(2) JEM
Keyword(3) Power system
1st Author's Name Yasuhiro Shimizu
1st Author's Affiliation Mitsubishi electric corporation Kamakura works()
Date 1998/11/19
Paper # A・98-120,SANE98-87,SAT98-65
Volume (vol) vol.98
Number (no) 404
Page pp.pp.-
#Pages 83
Date of Issue