Presentation 2019-11-26
Study on optimization of equipment configuration of base transceiver stations that operate without power supply by electric power system
Masaysu Sumiya, Yuji Hosokawa, Kazuhiko Takeno,
PDF Download Page PDF download Page Link
Abstract(in Japanese) (See Japanese page)
Abstract(in English) NTTdocomo has been setting up electrically independent BTS (Base Transceiver Station) with solar panels in areas where is no electricity to expand the data communication area. In this study, for the purpose of optimizing the configuration of the electrically independent BTS equipment, we verified through a simulation for a BTS in Hokkaido.
Keyword(in Japanese) (See Japanese page)
Keyword(in English) BTS with solar panel / solar panel / battery / simulation
Paper # EE2019-47,CPM2019-89,OME2019-33
Date of Issue 2019-11-19 (EE, CPM, OME)

Conference Information
Committee EE / OME / CPM
Conference Date 2019/11/26(1days)
Place (in Japanese) (See Japanese page)
Place (in English) Japan Society for the Promotiton of Machine Industry
Topics (in Japanese) (See Japanese page)
Topics (in English)
Chair Tadatoshi Babasaki(NTT Facilities) / Yutaka Majima(Tokyo Inst. of Tech.) / Mayumi Takeyama(Kitami Inst. of Tech.)
Vice Chair Keiichi Hirose(NTT Facilities) / Tadashi Suetsugu(Fukuoka Univ.) / Toshiki Yamada(NICT) / Yuichi Nakamura(Toyohashi Univ. of Tech.)
Secretary Keiichi Hirose(Sojo Univ.) / Tadashi Suetsugu(Nagasaki Inst. of Applied Science) / Toshiki Yamada(Tokyo Inst. of Tech.) / Yuichi Nakamura(Osaka Univ.)
Assistant Takashi Matsushita(NTT-F) / Tetsuya Oshikata(ShinDengen) / Yuu Yonezawa(FUJITSU Advanced Technologies) / Toshihiko Kaji(Tokyo Univ. of Agriculture and Tech.) / Yoshiyuki Seike(Aichi Inst. of Tech.) / Yasuo Kimura(Tokyo Univ. of Tech.) / Tomoaki Terasako(Ehime Univ.) / Fumihiko Hirose(Yamagata Univ.)

Paper Information
Registration To Technical Committee on Energy Engineering in Electronics and Communications / Technical Committee on Organic Molecular Electronics / Technical Committee on Component Parts and Materials
Language JPN
Title (in Japanese) (See Japanese page)
Sub Title (in Japanese) (See Japanese page)
Title (in English) Study on optimization of equipment configuration of base transceiver stations that operate without power supply by electric power system
Sub Title (in English)
Keyword(1) BTS with solar panel
Keyword(2) solar panel
Keyword(3) battery
Keyword(4) simulation
1st Author's Name Masaysu Sumiya
1st Author's Affiliation NTT DOCOMO,INC.(NTT DOCOMO)
2nd Author's Name Yuji Hosokawa
2nd Author's Affiliation NTT DOCOMO,INC.(NTT DOCOMO)
3rd Author's Name Kazuhiko Takeno
3rd Author's Affiliation NTT DOCOMO,INC.(NTT DOCOMO)
Date 2019-11-26
Paper # EE2019-47,CPM2019-89,OME2019-33
Volume (vol) vol.119
Number (no) EE-309,CPM-310,OME-311
Page pp.pp.63-64(EE), pp.63-64(CPM), pp.63-64(OME),
#Pages 2
Date of Issue 2019-11-19 (EE, CPM, OME)