Committee |
Date Time |
Place |
Paper Title / Authors |
Abstract |
Paper # |
R |
2023-12-07 14:15 |
Tokyo |
Kikai-Shinko-Kaikan Bldg (Primary: On-site, Secondary: Online) |
Optimal post-warranty maintenance policy with minimal repair for a continuously monitored system in non-renewable warranty period Miri Yoshizawa, Nobuyuki Tamura (Hosei Univ) R2023-50 |
This study considers a post-warranty maintenance policy for a product which degrades according to an Inverse Gaussian (I... [more] |
R2023-50 pp.1-5 |
SS |
2022-03-08 13:10 |
Online |
Online |
Evaluation of Automatic Program Repair Methods Using Program Editing Histories of Novice Programmers. Haruki Matsuo, Masanari Kondo, Yasutaka Kamei, Yuta Taniguchi, Naoyasu Ubayashi (Kyushu Univ.) SS2021-62 |
Automated Program Repair (APR) is a method of automatically correcting errors in a program without human intervention, a... [more] |
SS2021-62 pp.121-126 |
SS |
2021-03-03 13:50 |
Online |
Online |
Analysis of the Impact of Automatically Generated Test Cases on the Results of Automatic Bug Repair Yuga Matsuda, Kyosuke Yamate, Yasutaka Kamei, Naoyasu Ubayashi (Kyushu Univ.) SS2020-32 |
In order to reduce debugging costs in software development, there has been a lot of research on automatic program repair... [more] |
SS2020-32 pp.25-30 |
SS |
2021-03-03 15:00 |
Online |
Online |
Performance Evaluation of Automatic Bug Repair using Neural Machine Translation with Bug Fix Histories Gakuto Akiyama, Tsukasa Nakamura, Yasutaka Kamei, Naoyasu Ubayashi (Kyushu Univ.) SS2020-34 |
DeepFix is one of the automatic bug fixing tools.
It repairs syntax errors by embedding errors into error-free programs... [more] |
SS2020-34 pp.37-42 |
SS |
2020-03-04 16:05 |
Okinawa |
(Cancelled but technical report was issued) |
The Impact of Fault Localization Considering Developers' Intuition on Automatic Bug Repair Kyosuke Yamate, Takumi Shuto, Sho Asada, Ryosuke Sato, Yasutaka Kamei, Naoyasu Ubayasi (Kyushu Univ) SS2019-48 |
Research on automatic program repair has been actively conducted in order to reduce debugging costs in software developm... [more] |
SS2019-48 pp.43-48 |
SS |
2019-03-05 15:25 |
Okinawa |
|
Automatic Repair of Conditional Expressions for Functional Programs by Using Counterexamples Ken Matsui, Ryosuke Sato, Naoyasu Ubayashi, Yasutaka Kamei (Kyushu Univ.) SS2018-80 |
In software development, manual bug fixing consumes much time and effort. Therefore, automated program repair methods ha... [more] |
SS2018-80 pp.169-174 |
SS |
2019-03-05 17:15 |
Okinawa |
|
Towards automatic bug repair for enterprise source code files Sho Ikeda, Daito Nakano, Yasutaka Kamei, Ryosuke Sato, Naoyasu Ubayashi (Kyushu Univ.), Hiroshi Yoshitake, Hirofumi Yagawa (QNET) SS2018-84 |
Research on automatic program repair has been actively conducted for the purpose of improving productivity by shortening... [more] |
SS2018-84 pp.193-198 |
R |
2018-12-15 16:25 |
Okinawa |
|
Which is better to replace at number of works or failures Satoshi Mizutani, Toshio Nakagawa (AIT) R2018-50 |
This paper proposes some replacement policies in which the unit is replaced at $N$th working cycle or $K$th failure. We ... [more] |
R2018-50 pp.41-46 |
R |
2016-05-28 13:25 |
Aichi |
WINC AICHI |
Maintenance Overtime Poclicies with replacement at N project cycles over a planned time Satoshi Mizutani (AUT), Toshio Nakagwa (AIT) R2016-2 |
This paper proposes extended models for maintenance overtime policy. We assume that the unit is replaced at $N$th ($N=1,... [more] |
R2016-2 pp.7-12 |
R |
2015-12-18 13:55 |
Tokyo |
|
Nonparametric Estimation Method for Trend Renewal Process Based on Failure Rate Function Yasuhiro Saito, Tadashi Dohi (Hiroshima Univ.) R2015-62 |
Trend renewal process has some features of non-homogeneous Poisson process and renewal process, and can be used as a sto... [more] |
R2015-62 pp.7-12 |
R |
2014-12-19 14:05 |
Tokyo |
|
Availability Measure of One-shot Systems with Minimal Repair Tomohiro Kitagawa, Tetsushi Yuge, Shigeru Yanagi (NDA) R2014-67 |
One-shot system is a kind of systems that can be used only once during its life, whose failures are detected only throug... [more] |
R2014-67 pp.13-18 |
R |
2012-05-25 13:00 |
Shimane |
|
Optimal Policies with Interval of Dual System for Replacement Satoshi Mizutani (AUT), Toshio Nakagawa (AIT) R2012-1 |
This study considers optimal replacement policies in which the one unit system operates as a dual system when it is repl... [more] |
R2012-1 pp.1-4 |
NS |
2010-01-28 12:05 |
Fukuoka |
Fukuoka Institute of System LSI Design Industry (Fukuoka) |
An unavailability simulation of telecommunication networks based on the actual outage data
-- Reproduction of the correlation between outage scale and maintenance time -- Hiroyuki Funakoshi, Tatsuya Matsukawa (NTT) NS2009-147 |
The authors have been insisted on the importance of reliability management for IP networks constructed of commercial equ... [more] |
NS2009-147 pp.29-34 |
IN |
2010-01-14 15:45 |
Hiroshima |
Hiroshima City University |
Reliability management of telecommunication networks Hiroyuki Funakoshi, Tatsuya Matsukawa (NTT) IN2009-115 |
The authors have been insisted on the importance of reliability management for IP networks, and established the manageme... [more] |
IN2009-115 pp.29-34 |
NS |
2009-12-11 09:30 |
Ehime |
Ehime University (Ehime) |
An unavailability simulation of telecommunication networks based on the actual outage data
-- Derivation a reliability management object from simulation and evolution into the design of telecommunication networks -- Hiroyuki Funakoshi, Tatsuya Matsukawa (NTT) NS2009-130 |
The authors have been insisted on the importance of reliability management for IP networks constructed of commercial equ... [more] |
NS2009-130 pp.57-62 |
NS |
2009-10-15 14:20 |
Kumamoto |
Prefectural University of Kumamoto (Kumamoto) |
An unavailability simulation of telecommunication networks based on the actual outage data Hiroyuki Funakoshi, Tatsuya Matsukawa (NTT) NS2009-83 |
The authors have been insisted on the importance of reliability management for IP networks constructed of commercial equ... [more] |
NS2009-83 pp.37-42 |
R |
2009-05-29 16:10 |
Hiroshima |
Hiroshima Shudo University |
Optimal Random Preventive Maintenance Policies Mingchih Chen (Chaoyang University of Tech.), Syouji Nakamura (Kinjo Gakuin Univ.), Toshio Nakagawa (Aichi Inst. of Tech.) R2009-16 |
This paper considers a maintenance policy for an operating unit which works at random times. The unit undergoes minimal ... [more] |
R2009-16 pp.49-54 |
AI, IPSJ-DC |
2008-11-28 14:10 |
Okinawa |
|
Synonym Filtering Using Web Japanese N-grams for Translation Repair Support Mai Miyabe, Takashi Yoshino (Wakayama Univ.) AI2008-38 |
Translation repair has an important role in creating text that has a minimum amount of improper translations during comm... [more] |
AI2008-38 pp.85-90 |
IN, MoNA (Joint) |
2008-11-13 14:55 |
Fukuoka |
Kyushu Institute of Technology |
Performance Evaluation of Contents Distribution System for Communication-Broadcasting Integrated Services Akira Yamada, Hosei Matsuoka, Tomoyuki Ohya (NTT DOCOMO) MoMuC2008-62 |
A combination of communication and broadcasting systems is presently expected to create integrated new services. In this... [more] |
MoMuC2008-62 pp.5-9 |
IN |
2008-07-18 13:05 |
Hyogo |
Koube Univ. |
Time series analysis of time to repair distribution for telecommunication networks Hiroyuki Funakoshi, Tatsuya Matsukawa (NTT) IN2008-36 |
From the viewpoint of keeping the level of reliability in telecommunication networks, the reliability management in oper... [more] |
IN2008-36 pp.59-64 |