Paper Abstract and Keywords |
Presentation |
2008-11-06 11:00
[Invited Talk]
An Application of Process Scheduling Methods for Operating Systems to Intra-Shaft Operation Problem for Multi-Car Elevators Hiromichi Suzuki (Fujitec) CAS2008-48 CST2008-26 |
Abstract |
(in Japanese) |
(See Japanese page) |
(in English) |
Multi-Car Elevators (MCE) that have
several cars in a single shaft is
promising transport system and
operating methods for them are also eager to be developed.
In this paper, the author focused on the analogy
between
race conditions of multitasking operating system
in which plural processes compete to gain access
to computing resources
and
those of MCE in which
two or more cars attempt to occupy spaces of hoistway.
And this paper discusses application of thechniques for operating system
to establishment of intra-shaft operating method for MCE,
then its efficiency is shown through computer simulation. |
Keyword |
(in Japanese) |
(See Japanese page) |
(in English) |
multi-car elevator / selective collective / concurrent program / deadlock / / / / |
Reference Info. |
IEICE Tech. Rep., vol. 108, Nov. 2008. |
Paper # |
|
Date of Issue |
2008-10-30 (CAS, CST) |
ISSN |
Print edition: ISSN 0913-5685 Online edition: ISSN 2432-6380 |
Copyright and reproduction |
All rights are reserved and no part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording, or any information storage and retrieval system, without permission in writing from the publisher. Notwithstanding, instructors are permitted to photocopy isolated articles for noncommercial classroom use without fee. (License No.: 10GA0019/12GB0052/13GB0056/17GB0034/18GB0034) |
Download PDF |
CAS2008-48 CST2008-26 |
Conference Information |
Committee |
CAS MSS |
Conference Date |
2008-11-06 - 2008-11-07 |
Place (in Japanese) |
(See Japanese page) |
Place (in English) |
Osaka University |
Topics (in Japanese) |
(See Japanese page) |
Topics (in English) |
Graphs, Petri nets, Neural Networks |
Paper Information |
Registration To |
MSS |
Conference Code |
2008-11-CAS-CST |
Language |
Japanese |
Title (in Japanese) |
(See Japanese page) |
Sub Title (in Japanese) |
(See Japanese page) |
Title (in English) |
An Application of Process Scheduling Methods for Operating Systems to Intra-Shaft Operation Problem for Multi-Car Elevators |
Sub Title (in English) |
|
Keyword(1) |
multi-car elevator |
Keyword(2) |
selective collective |
Keyword(3) |
concurrent program |
Keyword(4) |
deadlock |
Keyword(5) |
|
Keyword(6) |
|
Keyword(7) |
|
Keyword(8) |
|
1st Author's Name |
Hiromichi Suzuki |
1st Author's Affiliation |
Fujitec (Fujitec) |
2nd Author's Name |
|
2nd Author's Affiliation |
() |
3rd Author's Name |
|
3rd Author's Affiliation |
() |
4th Author's Name |
|
4th Author's Affiliation |
() |
5th Author's Name |
|
5th Author's Affiliation |
() |
6th Author's Name |
|
6th Author's Affiliation |
() |
7th Author's Name |
|
7th Author's Affiliation |
() |
8th Author's Name |
|
8th Author's Affiliation |
() |
9th Author's Name |
|
9th Author's Affiliation |
() |
10th Author's Name |
|
10th Author's Affiliation |
() |
11th Author's Name |
|
11th Author's Affiliation |
() |
12th Author's Name |
|
12th Author's Affiliation |
() |
13th Author's Name |
|
13th Author's Affiliation |
() |
14th Author's Name |
|
14th Author's Affiliation |
() |
15th Author's Name |
|
15th Author's Affiliation |
() |
16th Author's Name |
|
16th Author's Affiliation |
() |
17th Author's Name |
|
17th Author's Affiliation |
() |
18th Author's Name |
|
18th Author's Affiliation |
() |
19th Author's Name |
|
19th Author's Affiliation |
() |
20th Author's Name |
|
20th Author's Affiliation |
() |
Speaker |
Author-1 |
Date Time |
2008-11-06 11:00:00 |
Presentation Time |
55 minutes |
Registration for |
MSS |
Paper # |
CAS2008-48, CST2008-26 |
Volume (vol) |
vol.108 |
Number (no) |
no.277(CAS), no.278(CST) |
Page |
pp.17-24 |
#Pages |
8 |
Date of Issue |
2008-10-30 (CAS, CST) |
|