Committee |
Date Time |
Place |
Paper Title / Authors |
Abstract |
Paper # |
NLP, MSS |
2024-03-13 13:30 |
Misc. |
Kikai-Shinko-Kaikan Bldg. |
Mixed integer programming model for flexible job shop problems with process converging Kosuke Aoki, Masaki Nakamura, Kazutoshi Sakakibara (Toyama Prefectural Univ.) MSS2023-76 NLP2023-128 |
In this paper, we propose a scheduling method for manufacturing sites that include production lines with convergence pro... [more] |
MSS2023-76 NLP2023-128 pp.29-34 |
ITS, WBS, RCC |
2023-12-21 15:15 |
Okinawa |
(Primary: On-site, Secondary: Online) |
Optimal control considering transmission cost of actuation signals Shumpei Nishida, Kunihisa Okano (Ritsumeikan Univ.) WBS2023-42 ITS2023-25 RCC2023-36 |
This report studies an optimal control problem that takes into account the transmission cost of actuation signals. The p... [more] |
WBS2023-42 ITS2023-25 RCC2023-36 pp.76-79 |
COMP, IPSJ-AL |
2023-05-10 14:30 |
Hokkaido |
Hokkaido University |
[Invited Talk]
Reallocation Problems with Minimum Completion Time Toshimasa Ishii (Hokkaido Univ.), Jun Kawahara, Kazuhisa Makino (Kyoto Univ.), Hirotaka Ono (Nagoya Univ.) COMP2023-1 |
Reallocation scheduling is one of the most fundamental problems in various areas such as supply chain management, logist... [more] |
COMP2023-1 p.1 |
ITS, IEE-ITS |
2023-03-13 15:05 |
Chiba |
Nihon Univ., Funabashi Campus (Primary: On-site, Secondary: Online) |
A Study on Reducing Transmission Waiting Time Using Non-Orthogonal Multiple Access in UAV Uplink Communication System Daiki Ikeda, Eiji Okamoto (NITech) ITS2022-80 |
Recently, a multi-stage relay transmission system using unmanned aerial vehicles (UAV) has been proposed to efficiently ... [more] |
ITS2022-80 pp.6-11 |
IN, NS (Joint) |
2023-03-02 13:40 |
Okinawa |
Okinawa Convention Centre + Online (Primary: On-site, Secondary: Online) |
Path Planning and Scheduling of Automated Guided Vehicles Iteratively Carrying Items Sumihiro Yoneyama, Hiroyoshi Miwa (Kwansei Gakuin Univ.) IN2022-82 |
This paper deals with a route planning scheduling algorithm for an automated guided vehicle (AGV) that repeatedly transp... [more] |
IN2022-82 pp.97-102 |
MSS, SS |
2023-01-10 16:25 |
Osaka |
(Primary: On-site, Secondary: Online) |
Some experimental results of the effects of the discretization parameters on piecewise linear approximation for cascade hydropower planning problem Ichiro Toyoshima, Ryota Mizutani (TOSHIBA ESS), Tomoki Takeuchi, Ryoichi Hara, Hiroyuki Kita (Hokkaido Univ) MSS2022-50 SS2022-35 |
Hydropower generation has been one of the main power resources in Japan. And it is drawing attention to the carbon neutr... [more] |
MSS2022-50 SS2022-35 pp.31-36 |
NS, ICM, CQ, NV (Joint) |
2022-11-25 10:10 |
Fukuoka |
Humanities and Social Sciences Center, Fukuoka Univ. + Online (Primary: On-site, Secondary: Online) |
Job Scheduling Problem Considering Content Generation Time in Edge Computing Hirofumi Osumi (Doshisha Univ.), Yusuke Ito (Kitakyushu Univ.), Tomotaka Kimura (Doshisha Univ.), Kouji Hirata (Kansai Univ.), Jun Cheng (Doshisha Univ.) NS2022-119 |
In this paper, we propose a job scheduling method based on content generation time in an edge computing environment. The... [more] |
NS2022-119 pp.109-112 |
CPSY, DC, IPSJ-ARC [detail] |
2022-10-12 13:30 |
Niigata |
Yuzawa Toei Hotel (Primary: On-site, Secondary: Online) |
Improvement and Evaluation of Two-Stage Scheduling on Distributed Processing Using Total Time Average Zhang Han, Masato Kitakami (Chiba Univ.) CPSY2022-23 DC2022-23 |
Due to the increasing complexity and scale of computer systems, parallel processing such as multi-core processing is oft... [more] |
CPSY2022-23 DC2022-23 pp.31-36 |
NS, SR, RCS, SeMI, RCC (Joint) |
2022-07-14 11:20 |
Ishikawa |
The Kanazawa Theatre + Online (Primary: On-site, Secondary: Online) |
A Study of Quantum Computing-based Cluster-Layering Method in Distributed Antenna Networks Keishi Hanakago, Ryo Takahashi, Takahiro Ohyama (PSNRD), Fumiyuki Adachi (Tohoku Univ.) RCS2022-82 |
In distributed antenna networks, where a large number of antennas are deployed in a communication service area, distribu... [more] |
RCS2022-82 pp.66-71 |
CAS, SIP, VLD, MSS |
2022-06-17 15:20 |
Aomori |
Hachinohe Institute of Technology (Primary: On-site, Secondary: Online) |
Petri Net-based QUBO Model Formulation for Flow Shop Scheduling with Setup Changes Takuya Shinjo, Morikazu Nakamura (Univ. of the Ryukyus), Norihiko Itani (Fujitsu Ltd.) CAS2022-17 VLD2022-17 SIP2022-48 MSS2022-17 |
This paper proposes a formulation method of quadratic unconstrained binary optimization (QUBO) model for flow-shop sched... [more] |
CAS2022-17 VLD2022-17 SIP2022-48 MSS2022-17 pp.90-95 |
COMP |
2022-03-06 10:50 |
Online |
Online |
On properties of Kirkman schedules applied the partial team swap Yusuke Kashiwagi (Seikei Univ) COMP2021-33 |
In this study, we show some properties of Kirkman schedules in applying the partial team swap. Kirkman schedule is the m... [more] |
COMP2021-33 pp.16-23 |
RCS, NS (Joint) |
2021-12-17 11:25 |
Nara |
Nara-ken Bunka Kaikan and Online (Primary: On-site, Secondary: Online) |
A Study on User Scheduling for Overloaded Environment in Distributed Antenna Network Using Quantum Computing Keishi Hanakago, Ryo Takahashi, Takahiro Ohyama (PSNRD), Fumiyuki Adachi (Tohoku Univ.) RCS2021-189 |
In a distributed antenna network, a large number of antennas are distributed over a base station coverage area (cell). H... [more] |
RCS2021-189 pp.75-80 |
MSS, CAS, IPSJ-AL [detail] |
2021-11-19 10:55 |
Online |
Online |
Ising Model Formulation for Job-shop Scheduling Problems based on Petri Nets Modeling Kohei Kaneshima, Morikazu Nakamura (Univ. of the Ryukyus) CAS2021-48 MSS2021-28 |
Quantum annealing has been drawing attention as a fast algorithm for solving combinatorial optimization problems.
The o... [more] |
CAS2021-48 MSS2021-28 pp.64-69 |
MIKA (3rd) |
2021-10-28 10:30 |
Okinawa |
(Primary: On-site, Secondary: Online) |
[Poster Presentation]
Performance Evaluation of Deployment Scheduling Method Considering Drone Connectivity Hirofumi Osumi, Tomotaka Kimura (Doshisha Univ.), Koji Hirata (Kansai Univ.), Jun Cheng (Doshisha Univ.) |
In this paper, we consider a deployment scheduling problem taking into account the connectivity of drones in drone commu... [more] |
|
CAS, NLP |
2021-10-15 13:00 |
Online |
Online |
Search Algorithms for Stowage Planning with Loading and Unloading Using Sequence-Triple Taiki Suzuki, Toshihiko Takahashi (Niigata Univ.) CAS2021-34 NLP2021-32 |
Stowage Planning is the problem determining an arrangement of given loads in a container of a desired size.
In this rep... [more] |
CAS2021-34 NLP2021-32 pp.95-100 |
CS |
2021-07-16 09:10 |
Online |
Online |
Deployment Scheduling Method Considering Drone Connectivity in Drone Communication Networks. Hirofumi Osumi, Tomotaka Kimura (Doshisha Univ.), Koji Hirata (Kansai Univ.), Jun Cheng (Doshisha Univ.) CS2021-26 |
In this paper, we consider a deployment scheduling problem taking into account the connectivity of drones in drone netwo... [more] |
CS2021-26 pp.50-54 |
RCS, SR, NS, SeMI, RCC (Joint) |
2021-07-16 13:00 |
Online |
Online |
On Time Slot Allocation Method with Statistical Channel State Information for Wireless Powered Sensor Networks Takeru Terauchi, Katsuya Suto (UEC), Masashi Wakaiki (Kobe Univ.) SR2021-36 |
Wireless power transfer via microwave is attracting interest because it solves the problem of battery of the sensors wit... [more] |
SR2021-36 pp.81-86 |
HWS |
2021-04-12 10:25 |
Tokyo |
Tokyo University/Online (Primary: On-site, Secondary: Online) |
Approximate Solution of Large-Scale Job Shop Scheduling Problem and Its Application to Hardware Cryptographic Design Kento Ikeda, Makoto Ikeda (Tokyo Univ.) HWS2021-2 |
The optimal design of cryptographic data paths in hardware can be considered as a job-shop scheduling problem. This prob... [more] |
HWS2021-2 pp.7-12 |
MSS, SS |
2021-01-27 13:50 |
Online |
Online |
Deep Reinforcement Learning based Networked Control under Limited Transmission of Observed Data Takahiro Kozuka, Kazumune Hashimoto, Toshimitsu Ushio (Osaka Univ.) MSS2020-38 SS2020-23 |
In this report, we consider a networked control system under channel constrains. Our purpose is to optimize both control... [more] |
MSS2020-38 SS2020-23 pp.54-59 |
SIP, IT, RCS |
2021-01-22 10:15 |
Online |
Online |
Proposal of a Method for Reducing the Amount of Calculation for Downlink Non-orthogonal Multiple Access Yohei Ishii, Toshinori Suzuki, Hideki Yoshikawa (Tohoku Gakuin Univ) IT2020-86 SIP2020-64 RCS2020-177 |
In this paper, we propose a method to reduce the amount of calculation, which has been a problem in the conventional met... [more] |
IT2020-86 SIP2020-64 RCS2020-177 pp.125-130 |